Loading
Page views this IP this session = 1 of 10 unsubscribed pagesOvenden Moor Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Ovenden Moor Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Ovenden Moor Wind Farm (Wind , Active) Location in the UK : England, West Yorkshire Type of installation: Wind on/offshore: on Turbines :9 Capacity : 20.7 MW Approx Date of 1st power generation: January 2017
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
12/00955/WDF | Repowering of wind farm including construction and operation of nine wind turbines (up to 115 metres to blade tip), construction of access tracks, crane hardstanding, temporary construction compound, underground cabling to network, new control building with substation and anemometer, to replace existing twenty three wind turbines, substation, control building and anemometer masts. | Ovenden Moor Windfarm Cold Edge Road Wainstalls Halifax Calderdale Ovenden Moor repowering will replace the 23 smaller turbines with 9 taller and moor effective turbines.
Completed with financial assistance from the European Union under its Thermie programme, which aimed to support the development of green technologies. For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Ovenden Moor Wind farm Cold Edge Road Ovenden Halifax West Yorkshire England
Relationship |
Company (For:
Ovenden Moor
) |
Operator | E.on UK | Installer | E.on UK |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Ovenden Moor (Repower) 18 MW
|
Energy Type: |
Wind Onshore |
County: |
West Yorkshire Country: England LPA: Calderdale Metropolitan Borough Council
|
Site ID and Reference: |
4408 / B0593
District:
|
Applicant: |
Yorkshire Windpower
Application :
12/00955/WDF
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
9 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
115 |
Calculated capacity: |
22.5 |
Site Address: |
Withens Road, Wainstalls, Halifax,
|
|
|
County: |
West Yorkshire Region: Yorkshire and Humber
|
OS Coordinates: |
404000 / 404000
|
Development Status: |
Operational
|
Application Submitted: |
8/2/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/21/2015
|
|
|
Generator Live |
1/24/2017
|
This Record Last Updated: |
2/2/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Ovenden Moor (Repower) 23 MW
|
Energy Type: |
Wind Onshore |
County: |
West Yorkshire Country: England LPA: Calderdale Metropolitan Borough Council
|
Site ID and Reference: |
3993 / EN00641
District:
|
Applicant: |
Yorkshire Windpower
Application :
09/00073/WDF
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
10 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
23 |
Site Address: |
Withens Road, Wainstalls, Halifax,
|
|
|
County: |
West Yorkshire Region: Yorkshire and Humber
|
OS Coordinates: |
404000 / 404000
|
Development Status: |
Revised
|
Application Submitted: |
3/25/2009
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
11/16/2012
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
4/23/2012 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Ovenden Moor WF
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00401RQEN
|
Capacity: |
18000
|
Status: |
Live
|
Accreditation Date: |
3/25/2009
|
|
|
Commission Date: |
1/24/2017
|
|
|
Applicant: |
Yorkshire Windpower Ltd
|
Applicant Address: |
c/o Powergen Renewables Ltd
Westwood Way
Westwood Business Park Coventry
CV4 8LG
|
Address: |
Cold Edge Road
Wainstalls
Halifax
HX2 7UA
England
|
Site Name: |
Ovenden Moor WF
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02998NWEN
|
Capacity: |
18000
|
Status: |
Live
|
Accreditation Date: |
3/25/2009
|
|
|
Commission Date: |
1/24/2017
|
|
|
Applicant: |
Yorkshire Windpower Ltd
|
Applicant Address: |
c/o Powergen Renewables Ltd
Westwood Way
Westwood Business Park Coventry
CV4 8LG
|
Address: |
Cold Edge Road
Wainstalls
Halifax
HX2 7UA
England
|
|
Assumptions: Capacity: 18000kW 18 MW, Thus over the month Capacity * 720 hours per month = 12960 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 4591 | 25.51% | Issued | 01/02/2018 | | | 5410 | 30.06% | Issued | 01/01/2018 | | | 6640 | 36.89% | Issued | 01/12/2017 | | | 6560 | 36.44% | Issued | 01/11/2017 | | | 5770 | 32.06% | Issued | 01/10/2017 | | | 7202 | 40.01% | Issued | 01/09/2017 | | | 3895 | 21.64% | Issued | 01/08/2017 | | | 1524 | 8.47% | Issued | 01/07/2017 | | | 1165 | 6.47% | Issued | 01/06/2017 | | | 2279 | 12.66% | Issued | 01/05/2017 | | | 2877 | 15.98% | Issued | 01/04/2017 | | | 3764 | 20.91% | Issued | 01/03/2017 | | | 4556 | 25.31% | Redeemed | 01/02/2017 | | | 2458 | 13.66% | Redeemed | 01/01/2017 | | | 357 | 1.98% | Issued |
|
Capacity: 41.4 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 21 m/s (46.977 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/29/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|